IEE study for Helipad (3.09 MW) of 25 MWp Grid Tied Solar Farms Project

IEE study for Helipad (3.09 MW) of 25 MWp Grid Tied Solar Farms Project

  • Project Date:05 November 2019
  • Our Team:
  • Client:
  • Categories:EIA Study
Description

NEAEC has signed a contract with Rastriya Prasaran Grid Company Limited to carry out the detailed Environmental Impact Assessment of Nalgad Hydropower Project. NEAEC has prepared and submitted first draft of review. Review from experts is in progress.