Detailed Review of the Draft EIA Reports of Nalgad Hydroelectric Project (NHEP-417 MW)

Detailed Review of the Draft EIA Reports of Nalgad Hydroelectric Project (NHEP-417 MW)

  • Project Date:05 June 2020
  • Our Team:
  • Client:
  • Categories:EIA Study
Description